Wetroom Tanking Systems: Building Control Requirements UK

Essential guide to meeting UK building control standards for wetroom waterproofing and tanking installations.

Creating a wetroom in your home represents one of the most sophisticated bathroom renovations you can undertake, offering both luxury and accessibility whilst potentially adding significant value to your property. However, the success of any wetroom installation hinges critically on proper tanking and waterproofing systems that meet stringent UK building control requirements. Understanding these regulations and implementing appropriate tanking solutions isn’t merely advisable—it’s essential for preventing catastrophic water damage and ensuring your wetroom passes building control inspection.

Understanding Wetroom Tanking and UK Building Regulations

Wetroom tanking refers to the comprehensive waterproofing system that creates an impermeable barrier between the water-exposed surfaces of your wetroom and the underlying structure of your home. Under UK Building Regulations Part H (Drainage and Waste Disposal) and Part C (Site Preparation and Resistance to Contaminants and Moisture), any wetroom installation must incorporate adequate waterproofing measures to prevent water ingress into the building fabric.

Building Control officers across England, Wales, Scotland, and Northern Ireland require evidence that your tanking system meets British Standard BS 5385-4:2015, which specifically addresses the design and installation of tiling and mosaics in wet areas. The regulations stipulate that:

  • All wetroom floors and walls must be tanked to a minimum height of 1,800mm in shower areas
  • The tanking system must extend at least 100mm beyond the shower area perimeter
  • Floor gradients must achieve a minimum fall of 1:80 towards the drain
  • All joints, corners, and penetrations must be properly sealed with appropriate waterproofing materials

Failure to comply with these requirements can result in your local Building Control department refusing to issue a completion certificate, potentially affecting your home insurance validity and creating significant problems when selling your property.

Types of Tanking Systems Approved for UK Wetrooms

The UK market offers several tanking systems that meet building control standards, each with distinct advantages depending on your specific installation requirements and budget. Understanding these options helps ensure you select the most appropriate system for your project.

Liquid Applied Membranes

Liquid waterproofing membranes represent the most popular choice amongst professional installers across London, Manchester, and Birmingham. These systems typically consist of a primer, followed by multiple coats of liquid membrane that cure to form a seamless, flexible waterproof barrier. Products like Mapei Mapegum WPS or BAL WP1 are widely accepted by Building Control departments and typically cost between £15-25 per square metre for materials alone.

Sheet Membranes

Pre-formed sheet membranes such as Schlüter-KERDI or Impey Waterguard offer excellent reliability and are particularly favoured in Scotland and Northern England where temperature fluctuations can stress liquid systems. These membranes cost approximately £20-35 per square metre and provide consistent thickness throughout the installation, though they require careful attention to joint sealing.

Tanking Kits

Complete tanking kits combining liquid membranes with reinforcement tape, corner seals, and pipe collars offer comprehensive solutions that simplify compliance with building regulations. Systems from manufacturers like AKW or Impey typically range from £200-500 for a standard-sized wetroom and include detailed installation instructions that Building Control officers appreciate.

Critical Installation Requirements for Building Control Approval

Achieving Building Control approval for your wetroom tanking system requires meticulous attention to several critical installation details that inspectors will scrutinise during their assessment.

Substrate Preparation

The substrate must be structurally sound, level (within 3mm over 2 metres), and capable of supporting the combined weight of tanking, tiles, and water exposure. Timber floors require a minimum 18mm WBP plywood or marine-grade plywood overlay, whilst concrete substrates must be properly primed and free from laitance or contamination.

Junction and Detail Waterproofing

Building Control officers pay particular attention to vulnerable areas where leaks commonly occur:

  • Wall-to-floor junctions must incorporate reinforcement tape or preformed corners
  • Pipe penetrations require appropriate collars or sleeves with minimum 50mm overlap
  • Doorway thresholds need special attention with tanking extended under door frames
  • Waste connections must be fully integrated into the tanking system

Testing and Documentation

Many Building Control departments now require flood testing of completed tanking installations before tiling commences. This involves temporarily damming the wetroom area and filling it with water to a depth of 20-40mm for 24-48 hours to verify waterproofing integrity. Photographic documentation of each installation stage proves invaluable during inspections.

Regional Variations and Local Authority Requirements

Whilst national building regulations provide the framework, individual local authorities across the UK may impose additional requirements or interpretations that affect wetroom tanking installations.

In London boroughs such as Westminster and Kensington & Chelsea, conservation area restrictions may limit structural modifications necessary for proper floor gradients. Edinburgh City Council often requires additional acoustic insulation beneath wetroom floors in tenement conversions. Meanwhile, coastal authorities in Cornwall and Devon may specify enhanced tanking specifications due to higher ambient moisture levels.

Birmingham City Council has recently introduced requirements for photographic evidence of tanking installation at specific stages, whilst Manchester Building Control typically requires manufacturer’s warranties for tanking systems in upper-floor installations. Cardiff Council has been known to request independent waterproofing certificates from approved inspectors for larger wetroom projects.

Cost Implications and Professional Installation

The total cost of implementing a Building Regulations-compliant tanking system varies considerably based on wetroom size, chosen system, and regional labour rates. For a typical 2m x 2m wetroom in the Midlands, expect to budget:

  • Tanking materials: £300-600
  • Professional installation: £400-800
  • Building Control application and inspection fees: £200-400
  • Flood testing (if required): £150-250
  • Remedial work allowance: £200-300

London and Southeast England typically command 20-30% higher rates, whilst Northern England and Wales often prove 10-15% more economical. Scottish installations may incur additional costs due to stricter thermal insulation requirements affecting floor build-up.

Professional installation by certified wetroom specialists provides several advantages beyond mere compliance. Experienced installers understand local Building Control preferences, maintain relationships with inspectors, and often guarantee their work against both installation defects and Building Control approval.

Common Pitfalls and How to Avoid Them

Understanding common failures that lead to Building Control rejection helps ensure first-time approval for your wetroom project.

Inadequate Falls

Insufficient gradient towards the drain remains the most frequent cause of Building Control concerns. Ensure your installer uses proper levelling compounds specifically designed for wetroom applications, achieving the required 1:80 minimum fall consistently across the shower area.

Incomplete Tanking Coverage

Building Control officers regularly identify gaps in tanking coverage, particularly behind sanitaryware and along skirting lines. Specify complete tanking to full room height in shower areas and minimum 300mm above floor level elsewhere.

Poor Workmanship at Details

Rushed or inexperienced installation often results in inadequate sealing at critical junctions. Insist on proper curing times between coats, correct tape application at corners, and manufacturer-specified overlap dimensions at all penetrations.

Future-Proofing Your Wetroom Installation

With increasing focus on accessibility and aging-in-place design, Building Control departments increasingly favour wetroom installations that exceed minimum requirements. Consider specifying:

  • Enhanced tanking extending to full room height on all walls
  • Secondary drainage provisions for overflow scenarios
  • Slip-resistant flooring meeting BS 7976-2:2002 standards
  • Adequate structural provision for future grab rail installation
  • Documentation package including warranties, certificates, and maintenance schedules

These enhancements typically add £500-1,000 to project costs but provide peace of mind and may expedite Building Control approval whilst adding long-term value to your property.

Conclusion

Successfully navigating Building Control requirements for wetroom tanking systems demands thorough understanding of both regulatory requirements and practical installation considerations. By selecting appropriate tanking systems, ensuring meticulous installation standards, and maintaining comprehensive documentation, you can create a luxurious, compliant wetroom that enhances your home whilst protecting its structural integrity. Whether you’re planning a wetroom in a Glasgow tenement, a London townhouse, or a Cardiff suburban home, investing in proper tanking and professional installation proves essential for both regulatory compliance and long-term satisfaction with your bathroom renovation.

🔍 Find Bathroom Renovations Near You

🔍 Searching for: Bathroom Renovations near me

Click the search button below to see results

Frequently Asked Questions

Do I need Building Control approval for a wetroom in my own home?

Yes, wetroom installations require Building Control approval as they involve structural alterations and waterproofing that must comply with Building Regulations Part C and Part H. You’ll need to submit either a Building Notice or Full Plans application to your local authority before commencing work, with fees typically ranging from £200-400 depending on your location.

What happens if my wetroom tanking fails Building Control inspection?

If your tanking system fails inspection, the Building Control officer will issue a notice detailing specific deficiencies requiring correction. You’ll need to remedy these issues—which might involve removing tiles and reapplying tanking—before requesting a re-inspection. This can add £500-2,000 to costs and delay project completion by several weeks.

Can I install wetroom tanking myself to save money?

Whilst DIY installation is legally permitted, Building Control officers scrutinise self-installed tanking systems more carefully and may require additional testing or documentation. Most manufacturers’ warranties become void without professional installation, and any subsequent water damage may not be covered by home insurance. Professional installation typically costs £400-800 but provides warranty protection and increases the likelihood of first-time Building Control approval.

How long does tanking need to cure before Building Control inspection?

Most liquid tanking membranes require 24-48 hours curing time before flood testing or inspection, though this varies by product and environmental conditions. Sheet membranes can typically be inspected immediately after installation. Always follow manufacturer’s specifications and allow adequate time in your project schedule—rushing the curing process is a common cause of inspection failure.

Updated on 29 October 2025

Get Free Bathroom Renovations Quotes

Tell us about your job and get quotes from vetted local professionals.

Scroll to Top